Gear shifting low drop out regulator circuits

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11036246
SERIAL NO

16131731

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electronic circuit includes a differential amplifier, an output stage and a control circuit. The differential produces a signal proportional to a difference between a reference voltage and a voltage that is proportional to the output signal. The output stage includes multiple switchable circuits coupled between a voltage source and the output terminal such that the switching of the circuits changes impedance between the voltage source and the output terminal. The control circuit receives a feedback indicative of the voltage of the output signal and controls the impedance of the multiple switchable circuits such that current flowing out of the voltage source rises piecewise smoothly from power-on to steady state operation of the electronic circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VERILY LIFE SCIENCES LLC2999 OLYMPUS BLVD 10TH FLOOR/STE 1000 DALLAS TX 75019

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kavousian, Amirpouya San Jose, US 21 107

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00