System and method for locating earth fault in power grids

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11035907
APP PUB NO 20190137559A1
SERIAL NO

16303420

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a multi-phase power grid fed by a power source, earth fault (460) is located by means of a power supply source synchronized with the power grid, which is connected between a zero point of the grid and earth. In a fault current compensation mode (420), a control unit controls the alternating voltage source to compensate for any ground fault current in the power grid to a value below a threshold level. In a fault detecting mode (430), the control unit gradually adjusts the output voltage of the alternating voltage source with respect to amplitude and/or phase angle (440). A change of zero-sequence current and zero-sequence admittance between the alternating voltage source and a fault location is measured (450) by means of at least one detector. The at least one detector is communicatively connected to the control unit and reports recorded measured values representing zero-sequence current and/or zero-sequence admittance to the control unit. In the fault detecting mode, the control unit localizes a ground fault (460) based on at least one of said measurement values representing changes of the zero-sequence current and/or zero-sequence admittance, upon which an affected branch is disconnected (470) or the system switches to the fault compensation mode (420).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WINTER BROTHERS AB196 37 KUNGSÄNGEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Winter, Andreas Stockholm, SE 220 6188
Winter, Klaus Kungsängen, SE 28 301

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 15, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00