Assembly and inspection cart for precision equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11034343
APP PUB NO 20190176863A1
SERIAL NO

16211881

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An assembly and inspection cart for precision equipment includes a frame that has three support portions to support the precision equipment at three points, air float devices attached to the frame at three positions, a rubber roller and a motor that are provided so as to be freely lifted and lowered with respect to the frame, and an air cylinder that lifts and lowers the rubber roller. The air float device floats the frame together with the precision equipment and forms an air layer between the frame and a floor surface. The rubber roller is arranged at a center of the three air float devices and is configured so as to press against the floor with a predetermined force when lowered by the air cylinder in a state where the frame is floated.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITUTOYO CORPORATION20-1 SAKADO 1-CHOME TAKATSU-KU KAWASAKI-SHI KANAGAWA 213-8533

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ogura, Katsuyuki Tochigi, JP 23 144
Sakuma, Mitsuyoshi Ibaraki, JP 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 15, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00