Composite and method for making

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11034129
APP PUB NO 20170232716A1
SERIAL NO

15435152

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite includes a first layer of a first fluoropolymer; a second layer of at least one ply of a reinforcing fabric overlying the first layer; and a third layer of a second fluoropolymer overlying the second layer opposite to the first layer, wherein the first layer, the third layer, or combination thereof have an outer surface that is defect free; wherein the composite has a continuous length of at least about 3 meters. Embodiments of such composites can find applications, for example, as processing aids for an electronic device, a food, a polymer, insulating an electrical device, or heat sealing a polymer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAINT-GOBAIN PERFORMANCE PLASTICS CORPORATION31500 SOLON ROAD SOLON OH 44139

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bergstrom, Helen K Somerville, US 3 3
Buss, Gerard T Bedford, US 23 103
Cushman, Michael P Williamstown, US 13 125
Pollock, Timothy P Manchester, US 11 29
Sargent, Joseph G Lowell, US 4 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 15, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00