Hand-held power tool in which the direction of rotation can be set

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11034012
APP PUB NO 20180361558A1
SERIAL NO

16061773

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hand-held power tool includes an output spindle and a drive unit configured to rotationally drive the output spindle such that the drive unit can be changed over between a first direction of rotation and a second direction of rotation in order to drive the output spindle in the first or second direction of rotation. The hand-held power tool further includes at least one operating element configured to initiate a changeover operation for changing over the drive unit between the first direction of rotation and the second direction of rotation such that the at least one operating element is in form of a monostable switching element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBH70442 STUTTGART

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bantle, Florian Westerheim, DE 14 73
Fuchs, Rudolf Neuhausen, DE 91 2041
Gairing, Juergen Stuttgart, DE 19 131

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 15, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00