Internal-combustion-engine control device and control method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11028798
APP PUB NO 20200347795A1
SERIAL NO

16643882

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A port injection valve injects fuel to an intake passage. In multiple injection processing, a demanded injection quantity of the fuel is divided into a synchronous injection quantity and a non-synchronous injection quantity in accordance with at least one of: the load, which is a physical quantity having a correlation with the amount of air to be filled; and the temperature of an internal-combustion engine. The fuel is injected through intake non-synchronous injection and intake synchronous injection in this order. In the intake synchronous injection, the fuel is injected synchronously with a valve-open period of an intake valve. In the intake non-synchronous injection, the fuel is injected at a timing more advanced than in the intake synchronous injection.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Higuchi, Akihiko Toyota, JP 10 57
Nakano, Tomohiro Nagoya, JP 82 376
Omachi, Takayuki Nisshin, JP 5 3
Toya, Masanori Toyota, JP 14 100

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 8, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00