Radiation-shielding material and manufacture thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11024435
APP PUB NO 20200143951A1
SERIAL NO

16179828

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Radiation-shielding composite materials and their methods of manufacture. Such methods may include adding a metal hydride to a hardenable matrix precursor, adding a reinforcing material to the hardenable matrix precursor, and hardening the matrix precursor to form a composite material that incorporates the reinforcing material and the metal hydride in a solid matrix. The resulting radiation-shielding composite materials are configured to attenuate incident radiation, and may be used in the construction of panels, laminate structures, buildings, and aerospace vehicles, among others.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY929 LONG BRIDGE DRIVE ARLINGTON VA 22202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Atwell, William Houston, US 1 2
Coad, Dennis Lynn Madison, US 10 13
Dobbs, James Ross Huntsville, US 3 66
Harris,, Jr Robert Jerrell Madison, US 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 1, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00