Optical film and light fixture with such an optical film

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11022272
APP PUB NO 20180274749A1
SERIAL NO

15762286

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical film made from a light-permeable material includes a surface and an optical microstructure having a plurality of elevations. The elevations of the microstructure protrude from a reference plane, which is parallel to the surface. The elevations of the microstructure each have a flank section which adjoins the reference plane and forms a uniform angle with the reference plane. The uniform angle is in a range from about 33° to about 42° or in a range from about 35° to about 40°. The optical film according to the invention makes it possible to provide a light fixture with relatively strong glare suppression and at the same time to produce a preferred light distribution curve (LDC). In addition, it can be relatively flexibly moulded and cost-effectively produced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
REGENT BELEUCHTUNGSKORPER AG4053 BASEL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dreyfus, Thierry Basel, CH 8 50
Fernandez, Oscar Pratteln, CH 7 29
Ferrini, Rolando Bern, CH 10 82
Hochfilzer, Christian Basel, CH 3 39
Reutter, Kornelius Basel, CH 3 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 1, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00