Three-stage parking jack

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11021137
APP PUB NO 20190135243A1
SERIAL NO

16182822

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A jack (1), which is extensible, comprising: a first tubular body (5), a second tubular body (30) slidably associated with the first tubular body (5) and movable along a predetermined longitudinal direction (A), a third tubular body (95) slidably associated with the second tubular body (30) and movable along the longitudinal direction (A), a base (115) for support associated with an end (105) of the third tubular body (95) distal from the second tubular body (30), characterized in that it comprises an automatic safety device (145) provided with a lockbolt (150) movable between a first position, wherein it allows relative sliding between the third tubular body (95) and the second tubular body (30), and a second position wherein it prevents the third tubular body (95) from sliding relative to the second tubular body (30).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIMOL S P A42045 LUZZARA (REGGIO EMILIA)

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Righetti, Valter San Benedetto Po, IT 5 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 1, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00