Non-contact detection of electrical energy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11016132
APP PUB NO 20200379025A1
SERIAL NO

16429506

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, systems, and apparatus, including computer programs stored on a computer-readable storage medium, for obtaining a reference phase signal that is synchronized with an alternating current (AC) phase of a multi-phase electrical power distribution system. The apparatus obtains output signals from sensors, each output signal representative of an electromagnetic emission detected by a respective sensor. The apparatus identifies, based on comparing respective phases of the output signals to the reference phase signal, a particular AC phase of the multi-phase electrical power distribution system associated with a source of the emissions. The apparatus provides an indication of the particular AC phase to a user.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
X DEVELOPMENT LLC1600 AMPHITHEATRE PARKWAY MOUNTAIN VIEW CA 94043

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Atwater, Joel Fraser Danville, US 24 99
Boyce,, Jr C O Lee Mountain View, US 9 25
Casey, Leo Francis San Francisco, US 45 455
Daly, Raymond Palo Alto, US 13 6
Evans, Peter Mountain View, US 60 60
Wang, Shuyu Mountain View, US 9 28
Xin, Siyuan Los Altos, US 14 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00