Boiler and modifying method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11015801
APP PUB NO 20180328583A1
SERIAL NO

15969890

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modification of a power boiler is disclosed, which comprises water walls enclosing the furnace for heating water and producing steam; a superheater system provided above the furnace for superheating steam; an additional superheater mounted in the furnace for further superheating steam from the superheater system. A modifying method of a power boiler is also disclosed, which comprises steps of mounting an additional superheater on water walls in a furnace; connecting an output of a superheater system to an inlet of the additional superheater; and connecting an outlet of the additional superheater to a turbine for producing power at an improved plant heat rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON RD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brueggemann, Hellmuth Stuttgart, DE 4 6
Gelbar, Danny Edward Windsor, US 1 0
Kluger, Frank Michael Stuttgart, DE 6 10
Miller, William Ross Aargau, CH 2 0
Weissinger, Gerhard Stuttgart, DE 6 4
Yin, Xiangmei Beijing, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 25, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00