Engine bearing offset and load

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11015527
APP PUB NO 20190153946A1
SERIAL NO

15821157

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Aspects of the disclosure are directed to a rotatable shaft, and a plurality of bearings coupled to the rotatable shaft, where the plurality of bearings include a first bearing, a second bearing, and a third bearing, where the first bearing defines an axial first bearing centerline, where the second bearing defines an axial second bearing centerline, where the third bearing defines an axial third bearing centerline, and where the axial second bearing centerline is radially offset from the axial first bearing centerline and the axial third bearing centerline.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RTX CORPORATION10 FARM SPRINGS RD FARMINGTON CT 06032

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Colucci, Joseph G Milford, US 3 11
Danley, Steven M Ellington, US 2 9
Davis, Michael M North Granby, US 16 45
Duffy, Kevin Hartford, US 56 450
Kovacik, Ronnie K Manchester, US 10 57
Rezvani, Tina Bolton, US 1 1
Rubendall, Richard J Wethersfield, US 1 1
Van, Duyn Keven G Bloomfield, US 13 373
Zimmitti, Jonathan F Glastonbury, US 28 193
Zuck, Christopher J Stevenson Ranch, US 6 53

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00