Energy packet control of generator prime mover

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11012016
SERIAL NO

17066982

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A controller may use energy packets to control a prime mover of a machine. The controller may include an energy packet measurement control to calculate energy packets and convert the energy packets into a fuel valve reference. Further, a frequency control may receive system feedback associated with the monitored machine and generate a frequency correction based on the system feedback. The controller may add the energy packet value and the frequency correction to determine a prime mover power reference and provide the prime mover power reference to a fuel valve control of the machine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHWEITZER ENGINEERING LABORATORIES INC2350 NE HOPKINS COURT PULLMAN WA 99163

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blood, Ellery A Moscow, US 17 70
Manson, Scott M Moscow, US 34 269
Schweitzer,, III Edmund O Pullman, US 100 1619
Zweigle, Gregary C Pullman, US 39 886

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 18, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00