Battery and battery system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11011786
APP PUB NO 20190198948A1
SERIAL NO

16291522

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A battery includes an outer packaging and a power generating element that contains a sulfur-based material and is included in the outer packaging and disposed in the inside of the outer packaging. The outer packaging includes a communicating port, a hydrogen sulfide eliminator, and an exhausting unit. The communicating port communicates between the inside and the outside of the outer packaging. The hydrogen sulfide eliminator and the exhausting unit are disposed in the communicating port. The exhausting unit introduces hydrogen sulfide generated caused by the sulfur-based material to the communicating port. The hydrogen sulfide eliminator eliminates the hydrogen sulfide introduced by the exhausting unit to the communicating port.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD1-61 SHIROMI 2-CHOME CHUO-KU OSAKA-SHI OSAKA 540-6207

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwamoto, Kazuya Osaka, JP 77 1417

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 18, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00