Process comprising acid pretreatment and enzymatic hydrolysis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11008598
APP PUB NO 20180037915A1
SERIAL NO

15550525

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided herein is a process for producing a fermentation product from a lignocellulosic feedstock. The process comprises soaking a lignocellulosic feedstock in an aqueous solution to produce a soaked feedstock. The soaked feedstock is at least partially dewatered and the at least partially dewatered feedstock is subjected to pretreating. The pretreatment chemical is sulfur dioxide, sulfurous acid or a combination thereof and can be added to the process at any stage prior to and/or during pretreatment. The pretreated feedstock composition is fed to an enzymatic hydrolysis conducted at a temperature that is higher than 58° C. The cellulose in the pretreated feedstock composition is hydrolyzed with cellulase enzymes in the presence of the dissolved solids to produce glucose. The glucose is fermented to produce the fermentation product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IOGEN CORPORATION310 HUNT CLUB ROAD EAST OTTAWA ONTARIO K1V 1C1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Foody, Brian Ottawa, CA 79 1358
Tolan, Jeffrey S Ottawa, CA 46 1077

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 18, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00