Cyclical reaction of calcium carbonate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11008591
APP PUB NO 20190106716A1
SERIAL NO

16153362

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention is directed to kits, compositions, tools and methods comprising a cyclic industrial process to form biocement. In particular, the invention is directed to materials and methods for decomposing calcium carbonate into calcium oxide and carbon dioxide at an elevated temperature, reacting calcium oxide with ammonium chloride to form calcium chloride, water, and ammonia gas; and reacting ammonia gas and carbon dioxide at high pressure to form urea and water, which are then utilized to form biocement. This cyclic process can be achieved by combining industrial processes with the resulting product as biocement. The process may involve retention of calcium carbonate currently utilized in the manufacture of Portland Cement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BIOMASON INC2 DAVIS DRIVE RESEARCH TRIANGLE PARK NC 27709

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dosier, Ginger K Raleigh, US 25 163
Dosier, J Michael Raleigh, US 19 83
Smith, Kent J Hurdle Mills, US 40 577

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00