Vertical bike stand

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11008060
SERIAL NO

16855425

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vertical bike stand contains: a base, a coupling column, a guide groove, and a positioning rack. The positioning rack includes a toothed section, and the support tube includes a channel. A holder is arranged on the support tube and is configured to close the channel and includes two prongs and a recess. A fixer is fitted on the support tube and is rotatably connected with a connector. The connector includes a shaft rotatably connected with the fixer, a press tab extending from an upper end of the connector, an operation portion extending outward from the press tab, an orientation segment extending into the guide groove from a lower end of the connector, and a paw extending from the orientation segment and configured to engage with the toothed section. The orientation segment is pushed by a first resilient element to fix in the fixer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YEONG TON INDUSTRIAL CO LTDNO 143 KEJI 5TH RD ANNAN DIST TAINAN CITY 709 ROC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Yao-Huang Tainan, TW 20 140

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 18, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00