Heat exchanger and method for producing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11007592
APP PUB NO 20180214963A1
SERIAL NO

15747486

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A heat exchanger includes multiple aluminum heat transfer tubes through which a heat medium flows, and multiple aluminum connection pipes brazed to end portions of the heat transfer tubes. A heat equalizing member formed of a heat conductor is disposed to be in contact with at least two of the connection pipes and be capable of transferring heat therebetween. A method for producing the heat exchanger includes brazing the heat transfer tubes to the connection pipes in a state where the heat equalizing member is in contact with the at least two of the connection pipes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO AIRCOOL CORPORATION2027-9 KITAHOTAKA HOTAKA AZUMINO-SHI NAGANO-PREF 399-8386

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hosono, Takefumi Kariya, JP 2 1
Iguchi, Takeshi Kariya, JP 10 67
Satou, Naoki Matsumoto, JP 9 33
Shingo, Haruki Kariya, JP 1 1
Yanagida, Akira Kariya, JP 11 76

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 18, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00