Control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11002239
APP PUB NO 20200309079A1
SERIAL NO

16717653

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control device includes an engine, a starter motor configured to perform engine start, a direct-current-to-direct-current converter, a battery coupled to the starter motor with the direct-current-to-direct-current interposed therebetween, and a controller. The controller is configured to execute control of switching between first and second traveling modes. The direct-current-to-direct-current converter is configured to supply an electric power of the battery to the starter motor, and to lower an output voltage to be supplied thereto. The controller is configured to execute output limit control of lowering the output voltage to lower the output current, in a case where an output current of the direct-current-to-direct-current converter becomes equal to or higher than a threshold. The controller is configured to initiate boost permitting control when initiating the engine start in association with switching from the second to first traveling mode. The boost permitting control makes the threshold higher than a usual threshold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUBARU CORPORATIONTOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Moriya, Fumiyuki Tokyo, JP 48 56
Watanabe, Ken Tokyo, JP 99 1061

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00