Method of engineering monolithic earthen masonry

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11002001
APP PUB NO 20210071408A1
SERIAL NO

16565831

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of engineering monolithic earthen masonry consists of selecting sufficient amount of subsoil mixture and straws, wherein physical characteristics of the subsoil mixture are determined from a sieve analysis test and a hydrometer analysis. The proper mixing ratios of the subsoil mixture and the straws provide a composite sample. The composite sample is then dried and lastly exposed to a compressive test. If optimal plurality of particle size percentage distributions within the subsoil mixture is not obtainable due to lack of resources, the end-product of the non-ideal subsoil mixture is adjusted within the aforementioned method or thickness and/or height of a building to compensate for the load-bearing capacities of the building.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MOUAWAD DANICARY NC

International Classification(s)

loading....
  • 2019 Application Filing Year
  • G01N Class
  • 13124 Applications Filed
  • 7738 Patents Issued To-Date
  • 58.97 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances20192020202120222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mouawad, Dani Cary, US 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • G01N Class
  • 0 % this patent is cited more than
  • 4 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges6401289574341211101 - 1011 - 2021 - 3031 - 4051 - 6061 - 7071 - 8005001000150020002500300035004000450050005500600065007000

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 11, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 11, 2032