Floats, float assemblies, float adapters and interfaces, and float vibration apparatus, and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11001976
APP PUB NO 20180327981A1
SERIAL NO

15775830

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A concrete float, float assembly, float adapter and interface, and float vibration apparatus and methods include a concrete float that have surfaces, and structures for controlling flow of wet concrete. An interface such as may be included in a quick attach/release configuration may be integrated on a float, and/or may be added onto a float for quick attach/release of a pivot assembly. Adapters may ease attachment or release of an assembly, and may be an interengaging element, such as a sliding dovetail as an interengaging element, or an adapter may be used to place an assembly in tension to secure the assembly. A vibration assembly may be included and configured to have a low center of mass, can have a user display, an accelerometer, and/or other components. A pivot assembly may be included for easier use by an operator, and may include a user display, quick release mechanisms.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BARON INNOVATIVE TECHNOLOGIES LPOXNARD CA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baratta, Anthony Oak Park, US 66 456
Brening, Scott Loomis, US 3 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 11, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00