Methods and apparatus and systems for establishing a registered score, slit or slot in a corrugated board, and articles produced there from

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11001027
APP PUB NO 20170341331A1
SERIAL NO

15677965

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods, apparatus, and systems increase converting accuracy and consistency of corrugated articles of manufacture such as blanks, intermediates or converted structures to minimize unintended gap variations, fishtail variations and visual discord as well as to minimize unintentional loss of strength due to conversion of such articles. The constitution of converted articles formed from a corrugated board blanks according to the invention comprises at least one intelligently located score, slit or slot (hereinafter collectively “registered modification”) based upon knowledge of the corrugated board's fluted medium, including the absolute relative location of at least one fluted medium feature and/or the fluted medium geometry, such as its pitch.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PACKAGING ACQUISITIONS I LLC123 W MILLS AVE STE 600 EL PASO TX 79901

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Greenfield, Giles Renton, US 22 137

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 11, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00