Hybrid tanks

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10995908
SERIAL NO

16659861

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A commercial hybrid tank includes a metal liner with an upper wall and a lower wall. The upper wall and the lower wall define a cavity therebetween. A weld joint joins the upper and lower walls together. A fiber winding layer is wrapped around an outer surface of the metal liner. A method for manufacturing a commercial hybrid tank includes overlapping surfaces of an upper wall and a lower wall to form a metal liner defining a cavity. The method includes joining the surface of the upper wall and the surface of the lower wall together by welding to form a weld joint between the upper wall and the lower wall. The method includes wrapping the metal liner with a fiber winding layer around an outer surface of the metal liner to form a hybrid tank.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMTROL LICENSING INC1400 DIVISION ROAD WEST WARWICK RI 02893

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kampf, Christopher Moosup, US 35 445
Van, Haaren Christopher A Warwick, US 27 210

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 4, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 4, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 4, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00