Organic Rankine cycle based conversion of gas processing plant waste heat into power

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10995636
APP PUB NO 20190055857A1
SERIAL NO

16165663

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system includes a waste heat recovery heat exchanger configured to heat a heating fluid stream by exchange with a heat source in a crude oil associated gas processing plant. The system includes an Organic Rankine cycle energy conversion system including a pump, an energy conversion heat exchanger configured to heat the working fluid by exchange with the heated heating fluid stream, a turbine and a generator configured to generate power by expansion of the heated working fluid, a cooling element configured to cool the expanded working fluid after power generation, and an accumulation tank. The heating fluid flows from the accumulation tank, through the waste heat recovery heat exchanger, through the Organic Rankine cycle energy conversion system, and back to the accumulation tank.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANY1 EASTERN AVENUE DHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kamel, Akram Hamed Mohamed Dhahran, SA 61 395
Noureldin, Mahmoud Bahy Mahmoud Dhahran, SA 87 657

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 4, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 4, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 4, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00