Heat shield assembly of a combustion chamber having a disk spring set

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10989412
APP PUB NO 20190107286A1
SERIAL NO

16085164

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A heat shield assembly of a combustion chamber has a supporting structure and heat shield elements arranged on the supporting structure. For fastening, the supporting structure has spring devices fastened therein, into each of which a fastening bolt can be screwed. In order to realize the pre-installation and the later removal of the spring elements contained in the spring device, at a holding sleeve, a contact plate is removably fastened in the holding sleeve on the side facing the heat shield element and a stationary securing plate is arranged on the opposite side.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS ENERGY GLOBAL GMBH & CO KGOTTO-HAHN-RING 6 MÜNCHEN 81739

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Böttcher, Andreas Mettmann, DE 41 104
Buse, Christoph Essen, DE 1 2
Hartmann, Manfred Mülheim an der Ruhr, DE 29 108
Kleinfeld, Jens Mülheim an der Ruhr, DE 16 55
Kluge, Andre Dülmen, DE 14 121
Lapp, Patrick Berlin, DE 12 33
Tenrahm, Thomas-Dieter Dinslaken, DE 5 47

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 27, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 27, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 27, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00