Hose arrangement

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10989338
APP PUB NO 20190360617A1
SERIAL NO

16419575

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hose arrangement for a motor vehicle may include a flexible elongated bellows including a plurality of radially orientated pleats and two axial longitudinal ends. The hose arrangement may also include at least one reinforcement rib which, on an outside, is coupled to a pleat tip of a respective pleat of the plurality of pleats in a material-bonded manner via two-component injection moulding. The at least one reinforcement rib may engage about the respective pleat in a circumferential direction. The at least one reinforcement rib may have at least two rib segments disposed following one another in the circumferential direction. Each of the at least two rib segments may radially cover the pleat tip by a segment angle of 30° to 310° in the circumferential direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAHLE INTERNATIONAL GMBH70376 STUTTGART
AVERIS GMBHHOFENER STRASSE 64 FELLBACH 70376

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Forstner, Michael Fellbach, DE 3 3
Guiton, Pierre-Yves Aichwald, DE 3 2
Kaiser, Sven Alexander Waiblingen, DE 7 10
Kohler, Samuel Weil im Schoenbuch, DE 11 14
Massimo, Parzani Sarnico, IT 1 1
Schindele, Katrin Baiersbronn, DE 3 2
Votteler, Georg Backnang, DE 13 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 27, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 27, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00