Method for producing beers stored, offered, served or consumed in UV-VIS-transmittant bottles with reduced sensitivity, in particular no sensitivity, to skunky thiol flavor degradation upon exposure to sunlight or other sources of UV and/or VIS light, and beers stored, offered, served or consumed in UV-VIS-transmittant bottles with reduced sensitivity, in particular no sensitivity, to skunky thiol flavor degradation upon exposure to sunlight or other sources of UV and/or VIS light

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10988719
APP PUB NO 20170298310A1
SERIAL NO

15509941

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for preparing a brewed beverage, in particular a light-coloured lager or ale beer, (to be) bottled, (to be) stored, (to be) offered, (to be) served or (to be) consumed in a UV-VIS-transmittant bottle, comprising the addition of hulupones and/or reduced hulupones during the brewing process in an effective amount to obtain a brewed beverage, wherein the fraction of hulupones and/or reduced hulupones in the total of isohumulones and (reduced) hulupones is at least 25 mol %, The invention further relates to a brewed beverage, in particular a light-coloured lager beer or ale beer, bottled, (to be) stored, (to be) offered, (to be) served or (to be) consumed in a UV-VIS-transmittant bottle, comprising (reduced) hulupones and wherein the frac-tion of hulupones and/or reduced hulupones in the total of isohumulones and (reduced) hulupones is at least 25 mol %.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IFAST NV1540 HERNE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mertens, Pascal Roosdaal, BE 12 79

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 27, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 27, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00