Method of preparing diene-based rubber latex, method of preparing ABS-based graft copolymer and method of manufacturing injection-molded article

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10988604
APP PUB NO 20180362750A1
SERIAL NO

15780222

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of preparing a diene-based rubber latex, a method of preparing an ABS-based graft copolymer including the same, and a method of manufacturing an ABS-based injection-molded article include preparing an in-situ bimodal rubber latex, in which a small-diameter polymer and a large-diameter polymer are formed in a desired ratio, by controlling contents, addition time points, and types of reactants when a conjugated diene based monomer, a crosslinking agent with a long linear chain end, an emulsifier including a multimeric acid of an unsaturated fatty acid or a metal salt thereof, and a molecular weight regulator are polymerized.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG CHEM LTDSEOUL 07336

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chung, Sun Haeng Daejeon, KR 10 29
Han, Su Jeong Daejeon, KR 12 29
Heo, Jae Won Daejeon, KR 26 65
Jeong, Young Hwan Daejeon, KR 18 28
Kim, Yoo Vin Daejeon, KR 16 29
Kim, Young Min Daejeon, KR 342 1756
Lee, Jin Hyoung Daejeon, KR 54 719
Suk, Jae Min Daejeon, KR 17 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 27, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 27, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00