Phase module for a power converter

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10985669
APP PUB NO 20190149059A1
SERIAL NO

16300402

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A phase module for a power converter includes first and second busbars and at least two semiconductor modules. The first busbar is connected to AC voltage connections of the semiconductor modules. The second busbar is connected to DC voltage connections of the semiconductor modules. At least one section of the first and second busbars is arranged at a distance to one another, the value of which is less than half the value of the distance between the AC voltage connection and the DC voltage connection of one of the semiconductor modules. At least one of the busbars has a separator arranged at a right angle on the remaining part of the busbar and connecting the busbar to at least one of the DC voltage connections or one of the AC voltage connections of one of the semiconductor modules. The separator is arranged along a surface of the one semiconductor module.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INNOMOTICS GMBHVOGELWEIHERSTRASSE 1-15 90441 NÜRNBERG 90441

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Böhmer, Jurgen Stein, DE 1 0
Boigk, Stefan Stein, DE 1 0
Kleffel, Rüdiger Erlangen, DE 6 22
Krafft, Eberhard Ulrich Nuremberg, DE 7 6
Weigel, Jan Grossenbuch, DE 11 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 20, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 20, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00