Valve apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10982782
APP PUB NO 20200149642A1
SERIAL NO

16544513

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A valve apparatus includes a valve block with a main flow path, a first valve installed on the valve block and connected to the main flow path so that when the first valve turns on, a first fluid is supplied from the main flow path to a process chamber via the first valve, and a second valve installed on the valve block and connected to the main flow path so that when the first valve turns off and the second valve turns on, a second fluid is supplied from the main flow path to a waste gas treatment system via the second valve. The main flow path is disposed parallel to a central axis passing through a center of the valve block and two opposing surfaces of the valve block perpendicularly thereto. The main flow path is disposed to be offset from the central axis toward the first valve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTD129 SAMSUNG-RO YEONGTONG-GU SUWON-SI GYEONGGI-DO 16677

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Chul Hwan Seoul, KR 19 61
Kong, Dae Wee Yongin-si, KR 6 11
Kyung, Se Jin Seoul, KR 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 20, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 20, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00