Condensate and feedwater system of steam power plant and operation method for the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10982567
APP PUB NO 20200271019A1
SERIAL NO

16710879

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A condensate and feedwater system includes: a deaerator circulation pump that returns condensate water flowing out from a deaerator to a part of a condensate line between a heater and the deaerator; an apparatus to be supplied with part of the condensate water flowing from the heater toward the deaerator, through a supply line branched from the condensate line; a supply line shutoff valve that switches between communication and interruption of the supply line; and a controller that controls opening/closing of the supply line shutoff valve and driving/stopping of the deaerator circulation pump. The controller closes the supply line shutoff valve from an open state at normal operation and at least temporarily drives the deaerator circulation pump from a stopped state at normal operation, in condenser throttling in which supply of extraction steam of a steam turbine to the heater and the deaerator is reduced as compared to that at normal operation and a deaerator water level control valve is closed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD2-3 MARUNOUCHI 3-CHOME CHIYODA-KU TOKYO 1008332 ?1008332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Datta, Supriyo Yokohama, JP 10 100
Fukunaga, Hiroshi Yokohama, JP 42 275

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 20, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 20, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 20, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00