Stud connection structure for noise reducing wall

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10982434
APP PUB NO 20210071414A1
SERIAL NO

16586878

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A noise reducing wall system is provided. The noise reducing wall system includes first and second board layers facing in parallel with each other along a longitudinal direction thereof, a heat insulation member surrounded by the first and second board layers, and a stud connection structure that fastens the first and second board layers using a stud bolt passing through the heat insulation member to connect the first board layer and the second board layer. The stud bolt connects the first and second board layers in a thickness direction and has a bent portion extending in the longitudinal direction and disposed at an intermediate point in the thickness direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO LTD22 DOOSANVOLVO-RO SEONGSAN-GU CHANGWON-SI GYEONGSANGNAM-DO 51711
GENERAL ELECTRIC COMPANY CO LTD1 RIVER ROAD SCHENECTADY NEW YORK NY 12345

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Jang Pil Gyeongsangnam-do, KR 1 0
Lee, Jong Kuk Changwon-si, KR 11 30
Lee, Sang Hyuk Yongin-si, KR 55 240
Lee, Sang Soon Changwon-si, KR 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 20, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 20, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 20, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00