Electric motor, compressor, air blower, and air conditioner

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10978923
APP PUB NO 20190356185A1
SERIAL NO

16463477

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electric motor includes a stator and a rotor including a permanent magnet and an electromagnetic steel sheet. The electromagnetic steel sheet includes a magnet insertion hole, a first outer peripheral surface including an inter-pole part of the rotor, a second outer peripheral surface including a magnetic pole center part of the rotor, a first slit elongated in a circumferential direction of the rotor, and a first portion formed between the first slit and the magnet insertion hole. A distance from the first outer peripheral surface to the stator is larger than a distance from the second outer peripheral surface to the stator. The electric motor satisfies θa<θb, where θa is a first angle formed by a first line and a second line and θb is a second angle formed by a third line and the second line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONCHIYODA-KU TOKYO 100-8310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujisue, Yoshikazu Tokyo, JP 11 76
Kumagai, Kazuya Tokyo, JP 15 49
Tsutsumi, Takahiro Tokyo, JP 34 222
Yabe, Koji Tokyo, JP 64 460

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00