Packaging and termination structure for a solid state battery

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10978682
APP PUB NO 20180138469A1
SERIAL NO

15701415

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for fabricating a solid state battery device. The device can include electrochemically active layers and an overlaying barrier material, with an inter-digitated layer structure configured with a post terminated lead structure. The method can include forming a plurality of battery device cell regions (1-N) formed in a multi-stacked configuration, wherein each of the battery device cell regions comprises a first current collector and a second current collector. The method can also include forming a thickness of a first and second lead material to cause formation of a first and second lead structure to interconnect each of the first and second current collectors associated with each of the plurality of battery device cell regions and to isolate each of the second current collectors extending spatially outside of the battery device cell region within a first and second isolated region, respectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAKTI3 INCANN ARBOR MI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Yen-Hung Ann Arbor, US 71 380
Chung, Myoungdo Ann Arbor, US 30 335
Kim, HyonCheol Ann Arbor, US 28 194
Lukich, Svetlana Longwood, US 5 35
Sastry, Ann Marie Ann Arbor, US 76 886
Wang, Chia-Wei Ypsilanti, US 156 2513
Weigman, Thomas V St. Anthony, US 5 158
Zhang, Xiangchun Ann Arbor, US 20 147

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 13, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00