Fluid system components with thermal conditioning passages

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10976118
SERIAL NO

16840512

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A flow control device includes a body and a flow control element. The body includes a thermal conditioning passage disposed within a side wall, disconnected from a flow passage, and extending between a first conditioning port and a second conditioning port. The thermal conditioning passage has a first portion extending circumferentially around a first circumferential portion of the interior surface of the flow passage, a second portion axially spaced from the first portion by a first axial U-shaped bend and extending circumferentially around the first circumferential portion and a second circumferential portion of the interior surface of the flow passage to form a first circumferential U-shaped bend, and a third portion axially spaced from the second portion by a second axial U-shaped bend and extending circumferentially around the second circumferential portion of the interior surface of the flow passage. The thermal conditioning passage further including a radial passage connecting a central portion of the first circumferential U-shaped bend with one of the first and second conditioning ports.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SWAGELOK COMPANY29500 SOLON ROAD SOLON OH 44139

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bianco, Robert Columbia Station, US 35 268
Dixon, Matthew R Parma, US 7 11
Elek, Jeremy Chagrin Falls, US 6 9
Mahraz, Karim Willoughby, US 8 11
Marshall, Andrew P University Heights, US 32 301
Reiger, Bryan S Willowick, US 11 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00