Exploitation of a photovoltaic system coupled to a joint water boiler-air/air heat pump air conditioning system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10976067
SERIAL NO

16442213

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a joint water boiler-air/air heat pump air conditioning system coupled to a photovoltaic system and intended to air condition a closed environment formed by one or more rooms and comprising an electrical system to which electrical appliances are connected, an electronic control system is programmed to compute electrical power production of the photovoltaic system and electrical power consumption of the electrical appliances in the closed environment, and, based thereon, a surplus electrical power production of the photovoltaic system with respect to the electrical power consumption of the electrical appliances in the closed environment. If a surplus of electrical power production of the photovoltaic system is determined to exist with respect to the electrical power consumption of the electrical appliances in the closed environment, it may be determined how many indoor units of the hot/cold air/air heat pump system can be electrically supplied simultaneously with the electrical power surplus.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALBASOLAR S R L12051 ALBA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Marengo, Massimo Alba, IT 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00