Jet engine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10975775
APP PUB NO 20170370295A1
SERIAL NO

15697969

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A jet engine which includes: a fan with a plurality of stages of rotor blades; a compressor compressing air sent from the fan; a combustor generating combustion gas by using compressed air generated by the compressor; a turbine generating a driving force from the combustion gas; a nozzle discharging the combustion gas; a variable guide vane disposed upstream of the rotor blades of a second and later stage of the rotor blades of the fan and adjusts an inlet angle of air flow against the second and later stage of the rotor blades; a fluid resistance adjusting device adjusting a fluid resistance at the nozzle; and a controller which controlling the variable guide vane such that the inlet angle at the time of cruise flight is smaller than the inlet angle at the time of acceleration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IHI CORPORATION1-1 TOYOSU 3-CHOME KOTO-KU TOKYO 135-8710

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kamei, Atsushi Tokyo, JP 6 78
Kimura, Takehiko Tokyo, JP 3 3
Murooka, Takeshi Tokyo, JP 15 295

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00