Inflatable beam and use of this inflatable beam

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10974160
APP PUB NO 20190374870A1
SERIAL NO

16485321

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Inflatable beam (1) comprising fire hoses or other industrial seamless hoses with woven textile braiding, inner air-tight lining and optional outer protective coating, is composed of an assembly of at least three hoses (2) arranged longitudinally side by side, where ends of the hose (2) are closed by a closure (3). At least one of the hoses (2) comprises at least one inlet and/or discharge member (4) for an inflating medium. The hoses (2) are at the point of contact of their circumferences, or at place of the closest distance of their circumferences mechanically connected by stiff connections (5) spaced along the length of the assembly of the hoses (2), at least one length (L) of at least one hose (2) between adjacent connections (5) of the hoses (2) is smaller than the length (M) of the other hoses (2) between these connections (5).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZEPELIN S R O911 01 TRENCÍN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brezan, Juraj Trenc̆ín, SK 5 7
Hodák, Henrich Trenc̆ín, SK 3 3
Ochodnický, Pavol Trenc̆ín, SK 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00