Engine speed control device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10968838
SERIAL NO

16616392

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An engine speed control device performing: a first PID gain calculation step of calculating a target engine speed to thereby calculate a first PID gain based on an engine speed deviation between the target engine speed and an engine speed; a target rack position calculation step of correcting the first PID gain based on a cooling water temperature to thereby calculate a target rack position of a fuel injection pump; a second PID gain calculation step of calculating a second PID gain based on a rack position deviation between the target rack position and a rack position; and a rack control signal producing step of correcting the second PID gain based on a lubricating oil temperature to thereby produce a rack control signal. The engine speed control device thus controls an engine speed by controlling the rack position based on the rack control signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YANMAR POWER TECHNOLOGY CO LTD1-32 CHAYAMACHI KITA-KU OSAKA 5308311

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iwano, Ryota Osaka, JP 6 9
Morita, Tomoaki Osaka, JP 6 20
Shimomura, Ryosuke Osaka, JP 10 16

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 6, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 6, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00