Motor drive system including power storage device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10965151
APP PUB NO 20190267835A1
SERIAL NO

16282918

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A motor drive system includes a converter configured to convert power between AC power in a power source and DC power in a DC link, an inverter for drive configured to convert power between the DC power in the DC link and AC power serving as drive power or regenerative power for a servomotor for drive, a motor control unit for drive configured to control the servomotor for drive connected to the inverter for drive, a power storage device configured to store the DC power from the DC link or to supply the DC power to the DC link, and a base holding energy change unit configured to change a base holding energy defined as a reference value of a holding energy of the power storage device, in accordance with the holding energy of the power storage device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FANUC CORPORATION3580 SHIBOKUSA AZA-KOMANBA OSHINO-MURA MINAMITSURU-GUN YAMANASHI 4010597 ?4010597

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ikai, Satoshi Yamanashi, JP 131 364
Shinoda, Shougo Yamanashi, JP 27 49

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00