Method and system for controlling hydrogen supply for fuel cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10964964
APP PUB NO 20190074529A1
SERIAL NO

15839227

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and a system for controlling hydrogen supply for a fuel cell are provided. The method includes calculating a target hydrogen supply pressure, which is a target pressure value of hydrogen supplied to a fuel cell stack based on a required output. A fuel supply valve (FSV) duty is then adjusted based on the calculated target hydrogen supply pressure and modes are determined based on the FSV duty or actual hydrogen supply pressure measurements of a sensor. A hydrogen supply pressure measurement is calculated according to each of the determined modes and the FSV duty is corrected based on the calculated target hydrogen supply pressure and the hydrogen supply pressure measurement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KIA MOTORS CORPORATION12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797
HYUNDAI MOTOR COMPANY12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797 06797

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Kyu Il Gyeonggi-do, KR 40 149
Min, Boung Ho Gyeonggi-Do, KR 13 18
Suh, Kyung Won Seoul, KR 16 40

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00