Fuel cell system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10964961
APP PUB NO 20190148747A1
SERIAL NO

16156473

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a fuel cell system, a controller is configured to, to stop the fuel cell system, (a) execute an oxidizing gas consumption process by supplying a fuel gas to an anode and sweeping current from a fuel cell while a supply-side on-off valve and an exhaust-side on-off valve are closed to seal the remaining oxidizing gas in the cathode, and (b) stop sweeping the current at a time point at which the difference between pressure of the cathode that decreases in response to the sweeping of the current and an estimated pressure value of the cathode that decreases by consumption of the oxidizing gas remaining in the cathode in response to the sweeping of the current becomes larger than a predetermined determination threshold value to end the oxidizing gas consumption process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kakimi, Yosuke Kariya, JP 3 0
Yamamori, Keitaro Okazaki, JP 7 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00