Process for the production of an organic acid from a lignocellulosic feedstock

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10961552
SERIAL NO

16332063

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Process for the production of an organic acid from a lignocellulosic feedstock. The process is integrated with a pulp mill and comprises: a) pre-treating a lignocellulosic feedstock with an alkaline liquor from the pulp, thereby obtaining a pretreated cellulosic feed and a black liquor; b) subjecting the pretreated cellulosic feed from step a) to enzymatic hydrolysis, thereby obtaining a saccharide feed; c) subjecting the saccharide feed from step b) to microbial fermentation using calcium oxide from the pulp mill as a neutralising agent, thereby obtaining an organic acid calcium salt; d) treating the organic acid calcium salt with sulfuric acid, thereby obtaining the organic acid; e) optionally isolating lignin from the black liquor obtained in step a), thereby obtaining lignin and weak black liquor; and f) returning the black liquor from step a) and/or the weak black liquor from step e) to the pulp mill chemical recovery process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RISE INNVENTIA AB114 86 STOCKHOLM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berglin, Niklas Täby, SE 1 0
Jansson, Mikael Skogås, SE 20 226
Robertsson, Victor Stockholm, SE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 30, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 30, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00