Electronic circuit, power conversion device, driving device, vehicle, and elevator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10958156
APP PUB NO 20190296635A1
SERIAL NO

16111457

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a semiconductor device including: a semiconductor element including a first electrode, a second electrode, and a gate electrode; a surge voltage measuring unit electrically connected to the first electrode or the second electrode and configured to measure a surge voltage; a variable resistor electrically connected to the gate electrode; a comparator configured to compare a surge voltage measurement value, which is acquired by measuring the surge voltage generated by a first pulse applied to the gate electrode by the surge voltage measuring unit, with a surge voltage target value; a determination unit configured to determine a setting value of a resistance value of the variable resistor based on the comparison result by the comparator; and an instruction unit configured to instruct the setting value to the variable resistor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOSHIBA1-1 SHIBAURA 1-CHOME MINATO-KU TOKYO 105-0023

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ikeda, Kentaro Kawasaki, JP 70 323

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00