RF power transistors with impedance matching circuits, and methods of manufacture thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10951180
APP PUB NO 20190190464A1
SERIAL NO

16211485

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of an RF amplifier include a transistor with a control terminal and first and second current carrying terminals, and a shunt circuit coupled between the first current carrying terminal and a ground reference node. The shunt circuit is an output pre-match impedance conditioning shunt circuit, which includes a first shunt inductance, a second shunt inductance, and a shunt capacitor coupled in series. The first shunt inductance comprises a plurality of bondwires coupled between the first current carrying terminal and the second shunt inductance, and the second shunt inductance comprises an integrated inductor coupled between the first shunt inductance and a first terminal of the shunt capacitor. The shunt capacitor is configured to provide capacitive harmonic control of an output of the transistor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NXP USA INC6501 WILLIAM CANNON DRIVE WEST AUSTIN TX 78735

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Krvavac, Enver Kildeer, US 26 304
Lembeye, Olivier Saint Lys, FR 18 66
Peyrot, Pascal Frouzins, FR 7 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00