System and process for pump assist to maximize fuel consumption in a natural gas powertrain

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10947905
SERIAL NO

16710779

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for pump assist to maximize fuel consumption in a natural gas powertrain includes a fuel delivery system including a natural gas storage tank supplying a first natural gas flow, a pressure sensor disposed to provide data regarding a natural gas pressure within the storage tank, and a natural gas pump operable to selectively boost the first natural gas flow to create a second natural gas flow with increased pressure. The system further includes an engine operable to utilize one of the natural gas flows to provide an output torque and including a fuel injector and a computerized fuel system controller programmed to monitor the data regarding the natural gas pressure within the storage tank, compare the data regarding the natural gas pressure within the storage tank to a threshold cut-off pressure for the fuel injector, and command activation of the natural gas pump based upon the comparing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 MAIL CODE 482-C23-B21 DETROIT MI 48265-3000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abd, Elhamid Mahmoud Troy, US 20 41
Cai, Mei Bloomfield Hills, US 203 3055
Dailly, Anne M West Bloomfield, US 42 303
Krentz, Richard H Bloomfield Hills, US 5 76

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00