Fuel nozzle, fuel supply assembly thereof, and method of assembling a fuel nozzle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10947902
APP PUB NO 20180355800A1
SERIAL NO

15621347

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An inlet manifold includes a main inlet oriented along a first direction and a pilot inlet oriented along a second direction perpendicular to the first direction. A wye passage includes an inlet branch in fluid communication with the main inlet. The inlet manifold also includes a first main passage in fluid communication with a first outlet branch of the wye passage and a second main passage in fluid communication with a second outlet branch of the wye passage. The first main passage extends generally along the first direction between the wye passage and a first main outlet. The second main passage extends generally along the first direction between the wye passage and a second main outlet. The inlet manifold also includes a pilot passage in fluid communication with the pilot inlet. The pilot passage extends generally along the first direction between the pilot inlet and a pilot outlet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Graham, Kaitlin Marie Greenville, US 19 89
Johnson, Thomas Edward Greer, US 130 2441
Myers, Geoffrey David Simpsonville, US 52 759

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00