Hydropower installation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10947687
APP PUB NO 20180010311A1
SERIAL NO

15547114

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydropower installation includes a water supply and an energy generating station, with the supply at a higher level than the energy generating station; and a duct extending between the supply and the energy generating station. The energy generating station of the hydropower installation is configured based on high water velocity and low pressure. The duct may comprise plastic pipes. The duct may be arranged on a foam support and enclosed by a foam embedment. The duct may comprise at least two duct sections, with an intermediate energy generating station arranged between the duct sections of the duct. The duct may comprise internally extending protrusions, such as dimples to promote a laminar flow of fluid through the pipe. The duct may taper. Water pressure inside the duct may be maintained at atmospheric level. The proposed features all contribute to a pressure free velocity based system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PROGENESYSVALKENIERSBORCH 14 HOUTEN 3992 CK

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harris, Guy Gardner The Hague, NL 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00