Multi-stage hydrocarbon lifting

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10941639
APP PUB NO 20190316451A1
SERIAL NO

16360342

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A production tubing is disposed in a wellbore formed in a subterranean zone. The production tubing extends from a surface of the wellbore to a downhole location at which hydrocarbons entrapped in the subterranean zone enter the wellbore. Multiple valves are disposed in the production tubing at respective multiple tubing locations. Each valve is configured to permit one-way flow of hydrocarbons in an uphole direction. The multiple valves divide the production tubing into multiple stages. A stage is a portion of the production tubing between two successively disposed valves. Multiple gas injection valves are coupled to the production tubing and are disposed in a respective stage. A controller, coupled to the multiple valves and the multiple gas injection valves, transmits signals to the multiple valves and the multiple gas injection valves to lift hydrocarbons flowed into the wellbore at the downhole location to the surface on a stage-by-stage basis.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANY1 EASTERN AVENUE DHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Gouhi, Al-Waleed Abdullah Dhahran, SA 3 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 9, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 9, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00