Railway station platform enhancement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10933891
SERIAL NO

16161588

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Intelligent railway station platform enhancement includes acquiring contextual information informing of a context in which movement of passengers through an area of a railway station is to occur. The area includes railway station platforms spaced apart by track(s). A decision model is applied to the acquired contextual information, and a determining is made whether to temporarily bridge together platforms using a bridge component between edges of the platforms. The bridging extends across track(s) to provide a route for passengers to traverse the track(s) and move between the platforms. The temporarily bridging is then initiated if it is determined to bridge the platforms together in this manner.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baughman, Aaron K Silver Spring, US 441 2542
Dietsche, Christoph Wilen, CH 1 3
Eggenberger, Christian Wil, CH 35 344
Scott, Debra Redwood City, US 4 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 2, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 2, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00